Engineering Excellence Since 1898

Portfolio

Baltimore County Office Building Boiler Replacement

Baltimore County

Based on the results of an Energy Audit performed by Henry Adams, the County contracted with Henry Adams to replace two 1954-era steam boilers which serve the building heating water system and air handling unit preheat coils. Henry Adams performed a feasibility study to convert the existing fuel-oil steam boilers to natural gas or and to replace them with new high-efficiency hot water boilers. The Contract included full commissioning services from developing the commissioning plan, inspection and start-up, and performance testing. Hazardous materials testing for asbestos and radioactive materials was completed during the design phase in order to develop a remediation and waste disposal plan which was required for the boiler refractory brick.