Henry Adams was responsible for the design for the chiller and cooling tower replacements at the Royal Danish Embassy. The design included a simplified analysis of various chiller efficiencies, verification of existing cooling loads, replacement of a 150 nominal ton chiller and two 90 nominal ton cooling towers, electrical system upgrades, temporary removal of ductwork and associated equipment, as well as maintaining minimal impact to the other systems and existing building.

Additional Information:

LocationWashington, DC
Construction Value $400,000
OwnerEmbassy of Denmark