VAMC Martinsburg, Chiller Plant Transformers

Henry Adams provided the electrical engineering design for the site survey to verify all existing conditions for the design of a new transformer for the VAMC Martinsburg chiller plant, Building 503. The new transformer was sized to support all of the electrical loads of the recently renovated chiller plant. Additionally, the new transformer was installed on an existing pad and connects to the existing primary and secondary cables.

Additional Information:

LocationMartinsburg, WV
Construction Value $850,000
OwnerVeterans Affairs Medical Center
ArchitectOKKS Studios / Delta
Go Back